AppendixThe Arithmetic
The four sections printed in the November 2026 edition. The remaining sections of the full appendix will be added here.
The sums behind the sentences, for the reader who wants to check them
This page carries the four sections the chapters send the reader to, under their section numbers: the working behind a figure the book gives as a phrase, and the tables a page could not carry. Each section ends with its sources. A figure with no name on it is the author’s sum from the inputs shown.
Which chapter each section serves
| Section | What it holds | Chapters |
|---|---|---|
| 1 | The household ceiling in Louisiana (Table A1), and what the five percentages measure | Eleven, Louisiana; Twelve, How Long |
| 3 | The fleet arithmetic: Meta’s plants against Entergy’s old ones | Eleven, Louisiana; Twelve, How Long |
| 9 | The race card | Twelve, How Long |
| 13 | The calendar of tests | Twelve, How Long; Afterword |
1. The household ceiling, and the five percentages
What it would add to one Entergy Louisiana household’s bill if Meta let its power contracts run out and the commission of that year put everything still owed on the plants into everyone’s rates. Chapter eleven points here; this is the working. Nobody else has filed a figure like it.
How each row is built. Entergy’s filed percentage of each plant’s cost that will have been paid off by the end of the contract is applied to the plant’s cost, as the consumer groups’ witness priced it. What is left is spread over the plant’s remaining filed life, multiplied by the residential share of Entergy Louisiana’s revenue (33.6 percent), divided among about 970,000 households and by twelve months. Change any input and the row moves.
Table A1. One Entergy Louisiana residential customer (1,000 kWh a month; Entergy’s October 2026 sample bill, $146.19, two cents above the commission’s comparison figure of $146.17 that chapter eleven gives)
| When | What is counted | Monthly effect on the bill | How it is worked |
|---|---|---|---|
| 2041 on (year 16), the three plants of 2025 | Depreciation on what is left, no return | about $3.10 more, for fifteen years | $3.2 billion over thirty years, $107 million a year |
| To 2048, the seven plants of 2026 | The plants while the contract runs | nothing, on Entergy’s projections | Meta’s minimum charges “offset more than 92%” of the plants’ yearly cost |
| End of 2048 | What is still on the books | about $3.4 billion of generation | 25 percent of $13,645 million, the seven plants as the consumer groups’ witness priced them (Entergy’s own total is about $12.9 billion): $784 million on Richland and the batteries (90 percent paid off), $2,627 million on Pointe Coupee (about 55 percent) |
| 2049 on (year 21), low case | Pointe Coupee’s depreciation only | about $5.20 more | $5,802 million over thirty-two years, $181 million a year |
| 2049 on, high case | Depreciation plus a 9 percent return on what is left | about $12 more, falling each year | Plus 9 percent on $2.6 billion, an assumed rate |
| 2049 and 2050 only | Richland’s and the batteries’ last two years | about $11.30 more, on top of the rows above | $784 million over two years |
| 2049 on, credit | What Pointe Coupee is worth as capacity | about $2.80 to $3.00 less at 2026/27 prices; about 70 cents less at $30 | 2,262 megawatts (three units of 754, by coincidence the same total as the 2025 plants) at the 2026/27 prices of MISO, the grid operator whose auction prices capacity in Louisiana, $116 to $126 a megawatt-day |
Reading the table. From 2049 the Pointe Coupee charge runs from about $2.20 a month (the low case, less what the plants earn as capacity) to about $12 (the high case, with no credit at all). In 2049 and 2050 the Richland remainder adds about $11.30, so the high case in those two years is about $23. The 2025 plants add about $3.10 a month from 2041. These are the figures chapter eleven sends the reader here for.
The table leaves out fixed operating costs, firm gas transportation and the turbines’ service agreements, none of which is public, and the settlement’s sealed terms. The household count is worked back from revenue, not counted. Entergy’s own model of a non-renewal in 2048 carried every remaining dollar to the other customers and credited nothing for what the plants could earn, and still left them about $991 million ahead over the twenty years: about $30.4 billion of modeled benefits against about $29.4 billion of modeled costs.
What the percentages measure. Five percentages recur in the filings, and no two measure the same thing. 100 percent (Lane Sisung, the Staff’s consultant, August 2025): the share of the 2025 plants’ cost Meta’s minimum bill covers to 2041, overruns included. 48 percent (Entergy’s own witness, as Cathy Kunkel quotes him): the share of the same plants’ thirty-year payments left for other customers after 2041; it counts payments, not book value. 92 percent (Entergy’s regulatory director, March 2026): the share of the 2026 plants’ yearly cost Meta’s minimum charges offset to 2048. 90 percent and 75 percent (the same witness): how much of the Richland units’ cost, and of all seven plants’ cost on average, is paid off by 2048. The 48 and the 75 cannot be set against each other: one is a share of payments on the 2025 plants, the other a share of book value on the 2026 plants.
Sources. Entergy Louisiana, residential sample bill, Schedule RS, October 2026; the commission’s residential bill comparison, October 2026 ($146.17). Direct testimony of Entergy Louisiana’s regulatory director (Jones), Docket U-37882, March 2026, pp. 16, 49, 60–63. Unit costs from Current Energy Group’s table for the Union of Concerned Scientists and the Alliance for Affordable Energy, as reprinted by Paul Arbaje (UCS), August 10, 2026, and The Lens, August 18, 2026. Entergy Corporation, Form 10-K for 2025, revenue note (residential $1,694 million of $5,048 million). Sisung, August 20, 2025 transcript, 44:22–23; Sisung, Cross-Answering Testimony, August 19, 2026, pp. 4, 50, 69–70 (the non-renewal model and its “approximately $991 million”). Kunkel, Direct Testimony, Docket U-37425, April 11, 2025, p. 24 (the 48 percent). MISO capacity prices: Ethan Howland, Utility Dive, April 29, 2025 and April 29, 2026.
3. The fleet arithmetic
Meta’s plants set against the old plants Entergy Louisiana would have had to replace anyway, by the utility’s own planning documents. The result is roughly one for one in 2041; by 2048 the seven plants are about twice the size of anything else that would be due to retire by then.
Entergy Louisiana’s 2023 resource plan says “about one-fourth of ELL’s total capacity is derived from legacy gas units, which range in age from 47 to 56 years of service,” and assumes they retire over the plan’s twenty years, 2023 to 2042. Its capacity in 2022 was “approximately 11,842 MW,” so one-fourth is about 3,000 megawatts.
Meta’s plants: 2,262 megawatts under the 2025 contract, which ends in 2041, and 5,278 megawatts under the 2026 contract, which ends in 2048. Together 7,540, against the 4,500 megawatts Entergy’s chief executive said the campus would draw. Entergy plans the supply to the customer’s maximum demand plus a reserve margin under the grid operator’s rules; the public filings read for this book do not otherwise reconcile the two figures.
2041. About 2,300 megawatts come free as the last of about 3,000 megawatts of legacy gas retires. Roughly one for one.
2048. About 5,300 megawatts come free after the legacy gas is gone. The next-oldest plants on the system would then be the combined-cycle units (gas turbines whose exhaust heat raises steam for a second turbine) and turbine units of the early 2000s (Acadia, Union, Perryville, Ouachita and others), roughly 2,500 to 3,000 megawatts, then forty-five to forty-eight years old. About two for one: a surplus of two to three gigawatts until the state’s load grows into it.
Gas. Older gas steam units typically need about 10,000 to 11,000 Btu of fuel for each kilowatt-hour; a new combined-cycle unit about 6,300 to 6,500. By that ratio, from general industry figures, a new plant burns about 40 percent less gas.
Union Power. The precedent, the plant Entergy bought in 2014 for about half what a new one would cost: $948 million, or $479 a kilowatt.
Sources. Entergy Louisiana, 2023 Integrated Resource Plan, p. 21; Entergy Corporation, Form 10-Q for the quarter ended June 30, 2026 (the seven plants, 5,278 megawatts, in service “in 2030 and 2031”); Kunkel, Direct Testimony, April 11, 2025, p. 6 (the 2025 plants, 2,262 megawatts); The Advocate, October 8, 2026 (the 4,500 megawatts); Entergy Louisiana, response to Staff data request 5-1, Docket U-37882 (maximum demand plus a reserve margin); Entergy news release, December 9, 2014 (Union Power).
9. The race card
The eight runners on one page. Chapter twelve’s close calls Meta the worst positioned of the builders because it has no outside customers for its capacity and its spending ran ahead of its cash; this card sets those facts beside the other runners’. Figures are the latest published as of early November 2026.
| Runner | Capital spending against operating cash, latest period | Free cash flow, latest | Outside customers for the capacity | Credit rating (Moody’s / S&P) | Earliest hard test |
|---|---|---|---|---|---|
| Microsoft | 68% ($39.4bn ÷ $58.0bn, quarter to Sept 2026) | +$18.6bn (quarter) | Yes: Azure | Aaa / AAA | June 30, 2027: free cash flow promised to stay positive for the fiscal year as spending speeds up |
| Alphabet | 121% ($51.4bn ÷ $42.3bn, quarter to Sept 2026) | −$9.1bn (quarter) | Yes: Google Cloud, $30.7bn a quarter | Aa2 / AA+ | Early 2027: its 2027 spending figure |
| Amazon | 182% ($77.3bn ÷ $42.4bn, quarter to Sept 2026) | −$42.4bn (twelve months; by coincidence the same figure as the quarter’s operating cash) | Yes: AWS, $46.0bn a quarter | A1 / AA | Early 2027: its 2027 spending figure |
| Meta | 106% ($34.9bn ÷ $32.8bn, quarter to Sept 2026) | −$2.1bn (quarter); about +$11bn for nine months | No public cloud | Aa3 / AA−, outlook negative | Late January 2027: its first 2027 spending figure |
| Oracle | 174% ($55.7bn ÷ $32.0bn, fiscal year to May 2026) | −$28.7bn (twelve months to Aug 2026) | Yes: Oracle Cloud; about half its backlog is OpenAI | Baa2 / BBB− | Aug 2027: a $5.14bn loan due; Dec 2027–May 2028: the promised turn |
| OpenAI | A tenant; rents its computing | −$25bn planned for 2026; −$57bn for 2027 | Yes: about $50bn a year of revenue | Not rated | 2027: a new raise or a listing |
| Anthropic | A tenant; $0.48bn against $8.9bn of computing cost (first half 2026) | +$3.9bn operating cash (first half 2026) | Yes: about $67bn a year of revenue, gross | BB+, the top grade of junk, from KBRA (Kroll Bond Rating Agency) only | Its listing; the SpaceX notice window |
| xAI / SpaceX | About 8 times ($28.5bn ÷ $3.5bn, first half 2026) | About −$25bn (first half 2026) | Its AI business is mostly rent from Anthropic and Google | Baa1 / BBB | Jan 1, 2027: its tenants may give notice |
Reading the card. Alphabet, Amazon, Meta and Oracle spent more on plant than their operations brought in over the latest reported period; Microsoft, at 68 percent, did not. Meta alone among the five public builders has no cloud to rent its capacity to outside customers, so its machines earn only through its own advertising. Meta’s free cash flow for the nine months to September 2026 was still positive; only its September quarter was negative.
Sources. Each company’s latest quarterly filing or release: Meta, Form 8-K of October 21, 2026 and Form 10-Q for the quarter ended September 30, 2026; Oracle, Form 10-K for fiscal 2026 and Form 10-Q for the quarter ended August 31, 2026; Microsoft (WinBuzzer), Alphabet (PPC Land; 24/7 Wall St.) and Amazon (Implicator; FourWeekMBA) as reported at the end of October 2026; SpaceX’s Form 10-Q (FourWeekMBA, October 13, 2026); Anthropic’s registration statement (PPC Land, October 26, 2026); OpenAI (The Information, June 16, 2026; Financial Times, September 2026). Ratings: Moody’s, February 23, 2026; S&P’s letters as reported, including Meta’s outlook of October 30, 2026 and Oracle’s rating of July 9, 2026; SpaceX’s of June 18, 2026; KBRA, June 2026. The ratios are the author’s division of each company’s two reported figures.
13. The calendar of tests
The dates on chapter twelve’s clock, with the others the filings set beside them, in order, each with its source. The Afterword asks the reader to set these dates beside the year on a fund’s label.
| Date | Event | Source |
|---|---|---|
| Dec 16, 2026 | The Louisiana commission votes on the seven plants, in Shreveport | the commission, Alexandria, April 15, 2026; the secretary, Baton Rouge, August 12, 2026 |
| From Jan 1, 2027 | Anthropic and Google may give ninety days’ notice on their SpaceX computing ($1.25 billion and $920 million a month) | INDmoney, citing SpaceX’s filings |
| Late Jan to early Feb 2027 | Meta, Alphabet and Amazon give their first 2027 spending figures | company practice; dates not announced as of November 3, 2026 |
| Feb 17, 2027 | Five years from Cathie Wood’s “if you give us five years” | CNBC excerpts, February 17, 2022 |
| First half of 2027 | The third Ellendale building due | Applied Digital, release of October 7, 2026 |
| June 2027 | Michael Burry’s puts on Micron and Nebius expire | IBTimes, September 29, 2026, from his post of September 28 |
| June 30, 2027 | End of Microsoft’s fiscal 2027, for which it promised free cash flow would stay positive | WinBuzzer, October 29, 2026 |
| 2027 | OpenAI’s projected burn of $57 billion; a new round or a listing | The Information, June 16, 2026; Financial Times, September 2026 |
| 2027 | All of Harwood’s 200 megawatts due for Oracle, the first by the end of 2026 | Applied Digital, presentation of October 22, 2025, and results of July 27, 2026 |
| Aug 2027 | Oracle’s $5.14 billion term loan falls due | sec-api.io, October 8, 2026, from the filings |
| Sept 2027 | Burry’s puts on Nvidia, the SOXX chip index, the Nasdaq-100 and Palantir expire | IBTimes, September 29, 2026 |
| Dec 2027 | Burry’s Oracle puts expire, the last of his clock | IBTimes, September 29, 2026 |
| Dec 2027 to May 2028 | Oracle’s promised turn to positive free cash flow | Oracle Investor Day, October 28, 2026 |
| 2028 | OpenAI’s March 2026 money runs out on its own plan; Nvidia’s $105 billion guarantee behind OpenAI’s leased data centers in Ohio comes into force as the leases begin; S&P’s models have the field’s cash flow turning; the end of the years in which Burry says the builders understate depreciation by $176 billion | Financial Times, September 18, 2026, via Reuters; Nvidia Form 8-K, August 17, 2026; S&P, August 27, 2026; Burry’s post of November 10, 2025 (chapter seven) |
| Late 2028 | Entergy Louisiana’s first plants for Meta, the two units at Franklin Farms, due in service | Louisiana Illuminator, December 1, 2025 |
| 2028 or 2029 | Burry’s written date for the write-offs | his post of September 24, 2026, as reported |
| 2029 | Meta’s Louisiana lease begins | Meta Form 10-Q, quarter ended September 30, 2026 |
| 2030 | The $2.35 billion of 9.25 percent notes on the first two Ellendale buildings fall due; the first chips of the race, bought in 2023 and 2024, written off on server lives of five to six years; ARK’s Big Ideas 2026 forecasts fall due | Applied Digital, Form 8-K, November 13, 2025; Meta’s and Amazon’s annual reports for 2025; ARK, January 21, 2026 |
| 2030 and 2031 | The seven Louisiana plants of 2026 enter service | Entergy Form 10-Q, quarter ended June 30, 2026 |
| 2031 | The $2.15 billion of 6.75 percent notes on Harwood and the $1.59 billion of 7 percent notes on the third Ellendale building fall due | Applied Digital, Form 8-K of March 2, 2026, and release of October 7, 2026 |
| 2033 | The first four-year break in Meta’s Louisiana lease | 2029 plus four |
| 2041 | The 2025 Louisiana power contract ends | the contract’s fifteen-year term (chapter eleven) |
| 2048 | The 2026 Louisiana power contract’s twenty-year term ends | Sisung, Cross-Answering Testimony, p. 50 |
| May 2049 | The Louisiana buildings’ bond matures | IFR; the bond’s terms as chapter seven gives them |
Someone Is Going to Lose: Samuel Insull, the AI Race, and the Price of Building the Future Too Soon. In paperback, hardback and for Kindle.